The framing around the fireplace started
The foilboards are also all installed to the concrete walls
Jason busy cleaning out the woodchips and sawdust in the window frames before the glazing goes in...
Look at all the sawdust stuck inside the frames....heartbreak....
The electrician has cut the foilboards to prepare to rough in the electrical conduits
The kitchen bulkhead
The soffit is done too
Electrical rough-in
Depressing...the insulation is a heap on the floor. As the services are being roughed-in, the guys just pull the batts out from the wall. Don't understand why the builder put them in the walls in the first place. Should have waited till all the services have been roughed-in.