The electrician fitted off our switchboard today, and we have electricty and lights! Jason was especially excited about it! He even took me to Barrett Street at night after work to check out the lights and to play with the switches!
Friday, October 7, 2011
Wednesday, October 5, 2011
Tuesday, October 4, 2011
Installation of the roller door
Another milestone for the backyard - finally the temporary chain wire fence is replaced by a secure roller door! We finally feel that our house is "secure" and no one can see into our backyard from the rear laneway! The roller door is massive...and so is the canopy! At least this will enable us to park our car in the backyard if we wish to...
The roller drum arrives...
and is lifted into place...
Then here comes the canopy...
and up it goes....
yup, it's big...
Note the door has a "reversed" colour, ie, the colorbond colour is actually on the face of the door that is facing inside...
Shot taken with the bluestone tiles sealed...!
Monday, October 3, 2011
The beautiful lacework
The front verandah received its final touches today, so the front facade is officially complete! The pretty lacework ("clover pattern", powdercoated charcoal to match our window frames) was installed. It is now a perfect facade!
The front fence and letterbox is also completed now.
Saturday, September 17, 2011
Carpet!
Our "black magic" carpet was installed today...
The underlay was THICK!
Very pleased with the results!
Thursday, September 15, 2011
Backyard Paving
The crates of bluestone paving have arrived...
Starting from the corner....
These bluestone tiles are carefully being laid in a staggered pattern
Half the backyard is done....
Wednesday, September 7, 2011
Backyard progresses...
The timber bench seat and BBQ area slowly taking shape...
Slatted timber to the shed has also been put in.
Joinery is completed with the timber cladding.
Wednesday, August 24, 2011
The Backyard Project
Now that the front is on its way, the backyard needs a little lovin' as well....
And so, the backyard project begins...
Ramon, our carpenter, starts to build the little shed (see the framing in the background to the right)
Shed's done...
Jason's painted the cladding to the shed.
The bench seating framing starts to go in...
Tuesday, August 23, 2011
Painting the front facade
Our painters carefully restored and painted the existing front facade to get it back to its former glory....
They are spraying the first coat under those tarps....
New roof sheets and gutters have also been put onto the verandah...
The next step....painting the picket fence, and also putting in the verandah lacework!
Saturday, July 30, 2011
Front Entry Deck and Fence
The front deck and planters, as well as the new turnposts and fascia for the verandah were completed.
The front picket fence was then also erected.
Tuesday, July 19, 2011
Louvre Screen
The external aluminium louvre screens at the rear of the second storey were installed. It was done in a couple of days, with access via the rear laneway and a scissor lift. One more item ticked off the list!
Sunday, July 17, 2011
Benchtops!
It was really really nice to see the benchtops going in!
The cantilevered bench to the ensuite vanity being installed here by
Amalgamated Marble.
The waterfall edge to the kitchen island bench. We were extremely pleased with the results, and were very happy to have come across these particular Carrara slabs.
Love the veining on the slabs...
The kitchen space feels good!
Friday, July 15, 2011
Front Deck
The front of the house had always been that part of the house that has been neglected, in a way. The verandah that was falling apart has finally been pulled down, and will be totally rebuilt.
The verandah and deck demolished.
Putting the stumps in for the front deck.
Joists and bearers put in place.
It took a while for us to decide on the spotted gum timber decking, which will also be used for the steps and the planter boxes. We are pretty pleased with the results.