Wednesday, August 4, 2010

AFS

Our ground floor external walls went up today, which was extremely exciting to see.  The AFS Logic wall panels arrived promptly on site at 8am.  The lightweight panels are erected efficiently on site, braced and reinforced.  They are then core-filled with concrete to create structural external walls.  We were very impressed with the speed at which our walls were erected, which would otherwise have taken a long time if we had used conventional blockwork walls.







Monday, August 2, 2010

Aftermath of a wintry weekend

What Jason saw when he arrived at our site early Monday morning.  The wind had picked up our back gate and hoarding and landed it in the bluestone laneway.

Thursday, July 22, 2010

The day our ground slab was poured...


The plastic's down,  reo's in...

...and with the electrical conduits laid as well...
we are all ready to pour!
oh...and don't forget to toss the gold coin into the foundations for good luck!

The concrete pour begins...








Done!

Friday, July 16, 2010

And more progress...

After the front house was re-stumped, we arrived back at the house only to find large cracks developing up the walls and plaster....That's because the house is now actually level! The front door could not even be closed properly!




The moulding to the arch in the hallway fell off while the builder stripped off the existing lining.  
So much for trying to retain existing features...
Miranda : Ahhhh! The house is falling apart!!!



Trenches to the back are now dug, with the sand beds in, in preparation for the slab pour the next day. In-ground services are also in place - the foreground shows the pipe connection to our kitchen island sink.

Thursday, July 8, 2010

Excavation & Bulk Earthworks

Here comes the excavator...


Digging the trenches and laying in-ground services



Our in-ground sewer pipe

The re-stumper at work...

Tuesday, June 29, 2010